Graffiti Busters Ltd was honoured to be involved in this innovative new bridge rebuild construction project, which carries the single carriageway A208 in Chislehurst over Network Rail’s Kent and London mainline railway.

The existing bridge was in poor condition and subject to numerous inspections. Our work comprised of  fully protecting the brick work external façade with a water proofing, liquid silicone solution combined with impregnation technology.

Designed to repel against environmental pollution and weather damage. This incredible piece of modern bridge replacement engineering was commissioned by The London Borough of  Bromley.